Ras Al Khais Jubail Railway line. Saudi Arabia
SILGA has been the responsible of the design of the structures of all rail and road structures included in the CTW110 contract for the railway connection between Ras Al Khais and Jubail
Structures included viaducts, overpasses and underpasses of various types (concrete box girders, precast girders and through-type U section concrete bridges). The contract also included the design of other minor structures like pipe and utility protections
The contract included all stages of the project from Concept to Detail designs, and assistance during construction.